Run an allergen changeover on snack line 2
You are a Production Operator on snack line 2 at Dandenong South.
What has happened
Snack line 2 finishes a run of apricot and almond fruit bars, which contain tree nuts, at the end of day shift. The first product on afternoon shift is apple and strawberry fruit bars, which are allergen free. The Allergen Management Policy requires a validated changeover between the two products and the line cannot start until the visual inspection and the allergen swabs have passed. Line leader Liam Fitzgerald is supervising and Priya Nair from quality will take the swabs. Earlier this week an obsolete sleeve with a superseded allergen statement was found in the packaging bay, so the label check for the new product is being watched closely.
Deliverables
- Completed changeover record
- Monitoring log entry for the allergen changeover
- Label check record for the new product
- New batch record opened with references
Documents to use
Systems to use
Critical Control Point Monitoring Log
Shift by shift monitoring records for every critical control point, with readings, limits, results and verification.
Production Batch Records
Every food, beverage and pharmaceutical batch from planning to release, with line, quantity, status and the notes that support release.
Non-conformance and CAPA Register
Register of every non-conformance, deviation, complaint and safety incident with investigation, corrective and preventive action and closure status.
Units of competency
Current on training.gov.au for the Food, Beverage and Pharmaceutical as at 10 September 2026.
FBPFSY3005Control contaminants and allergens in food processingFBPOPR2094Clean equipment in placeFBPOPR2095Clean and sanitise equipmentFBPOPR3004Set up a production or packaging line for operationFBPFSY2002Apply food safety proceduresQualifications
FBP30121Certificate III in Food ProcessingWhat to look for
Evidence guide
Look for the steps done in the order the procedure sets, rework labelled with allergen status, colour coded equipment used and returned, the line not started before the swab result is recorded as a pass, and a label check done against the approved artwork rather than the previous run. The monitoring log entry must show the changeover as verified by quality.